搜索“PTFE crd hold”的结果
您当地的世伟洛克授权销售与服务中心可能有其他选项。
-
Plug Valve Panel Mount Installation Instructions
Select the proper template (P4T or P6T). Use the template to mark the location of the mounting bracket holes and the center hole. Drill holes to the required diameter and countersink depth shown on the template.
-
Bellows Subassembly Replacement Instructions, BK Series Pneumatically Actuated Bellows Valves
Remove three (3) Capscrews from Cylinder Cap (9/64 in. hex wrench) and remove Cap; Remove Spring(s) - “1C” model only; Unscrew Bonnet Nut (1 in. open-end wrench).
-
Bellows Subassemblies Installation Instructions B, U, and HK Series
Installation Instructions for B, U, and HK series bellows subassemblies.
-
Processed according to Swagelok® Photovoltaic Process Specification SC-06, Specification SCS-00006
For a copy of the Photovoltaic Process Specification (SC-06) contact your authorized Swagelok sales and service representative or visit www.swagelok.com.
产品供货情况(按商店位置分类)
小时